Celtic interconnector

Client:

Wills bros

Category:

Energy sector

Location:

Carrigtwohill,Co.Cork

Date:

September 2025

Project Summary

A multi-phase structural steel project of 3 buildings. Control building, convertor hall and storage building. Over a 6 month time frame. All together on the job appox 700 tonnage of steel was installed.